

To be approved for the UEFA Champions League, stadiums have to fulfil a series of requisites, for which the Stadium had to be quickly renovated in 2005 to meet those regulations. The façade was covered with yellow tiles, both to improve aesthetics, and to benefit the local industry of tiles. The dressing rooms were also renovated, creating an office for the coach, physiotherapy room, and a bath and showers area. There were also created an office for the UEFA delegates, an anti-doping hall, and the room for press conferences was expanded.
The separation of the pitch from the public has been expanded one meter, and the entrance to the dressing rooms had to be revised. Two restaurants have been created inside the facilities, and the advertising system was computerized.




1 comment:
Also, the Replica Patek Philippe is taken to a new level of appeal because of several good modifications to it. First, is the Rolex Submariner Ceramic Bezel. The outgoing model utilizes an aluminium insert - this is scratched too easily and is beginning to look cheap. The new high tech ceramic bezel has molded in numerals (that wil not scratch off).
Post a Comment